What ya all working on??

Dig a trench, build forms, pour footing, remove forms, stack blocks, put in drainage tile, add gravel, add geogrid, add more blocks, add more gravel, install geotextile fabric, stack more block, add dirt. Drink beer.

You're welcome! 😎

Is beer required or will rum and bourbon do? If so that’s something I can handle.

I can build forms, pour footings, remove forms, and put i drainage tile. I’ll get some of the guys at work to do the rest after work. Tequila and cervasa’s go a long way for good work.
 
I used to work at bar years ago, and one time for some reason the boss had to get Bacardi rum cause there was no Morgan's. I told him people wouldn't drink it, he's like if we put it in Morgan's bottles they will, yeah, like fuck. So we switched bottles but you can tell by the smell before you even taste it. Nobody would touch it. I forget what we ended up doing with it, he had about 12 bottles
 
Not Bacardi tho, use that for degreasing the bush hog.

57893_c4de8c100a44968cd92a3a4ed4e05d2d_0.png


Good stuff.